Fix Auto Oswestry have had a 62KW system installed, which gave an overall Annual Electricity Saving of £21,000 and a payback cycle of 3.5 years. This new system ensures Fix Auto are contributing to their corporate social sustainability by avoiding 14 tons of Co2 per year. If this is something of interest to you, and […]
Fix Auto Wrexham have had a whopping 78KW system installed which is split over East and West aspects of the roof to ensure all day coverage. The Annual Electricity Saving tallies up to an impressive £27,000 with their Return-on-Investment clocking in at just under 3 years! If this is something of interest to you, and […]
IDES started 2024 on a high; working with Komoo on this new-build body shop. This project included a new installation of tray/trunking & ladder infrastructure, as well as new section boards to the Bodyshop. We utilised our energy-efficient AUTOLUX light fitting to provide an even distribution of light throughout the body shop. Our team worked […]
IDES started 2024 on a high; working with GBA on this new-build body shop, including the Installation of EV Chargers. The contract included: A full design package – site survey, lighting design, electrical instalment. Installation of galvanised trunking, tray and for electrical containment Emergency lighting Power supplied to the whole of the body shop, including […]
Recent Comments